Hi-line progress - 07/05/04 (Friday)
The construction zone. These are some of our steel support pylons and the side skirts for the turntable.
In the back is the mainline curving in front of the 7-1/4" service track, the white pumphouse
and our red clubhouse.
The lever to extend the 4-3/4" gauge locating pin..
The North/South 7-1/4" mainlines on the west side of our property. In the foreground
is a crossover and the service track branches off to the left.
Big Bill Evans, "Huh?"